Ashburnam Triangle Conservation Area Article 4 Direction Draft Guidance Note

What do we want to know:

The aim of the consultation is to gather feedback on the draft planning guidance document for the Article 4 Direction in place in the Ashburnham Triangle conservation area.

Description:

People can get involved by reading the draft document, making comments and sending these by email to building-conservation@royalgreenwich.gov.uk or by post to The Royal Borough of Greenwich Planning Policy Team, The Woolwich Centre, 35 Wellington Street, London SE18 6HQ.

Hard copies of the draft document can also be viewed at the Woolwich Centre and at Borough Libraries.

Outcome:

Contact:

Clare Loops

Directorate of Regeneration Enterprise and Skills

The Woolwich Centre
35 Wellington Street
London
SE18 6HQ

Project start date21 May 2014
Consultation end date14 March 2016
Results dueDue 13 July 2016
Methodology Statutory notice
Target audience Residents in a specific area
Topic of consultation Planning and building control
Area Whole borough